Introduction
An SCDF P&FM licence application for diesel storage for standby generators requires a tightly coordinated set of technical drawings and engineering calculations that demonstrate full compliance with Singapore’s fire safety regulations. For industrial facilities – factories, logistics hubs, data centres and process plants – getting this documentation right on the first attempt is the difference between a smooth 19-working-day review and months of queries and resubmissions. This article details exactly what the Singapore Civil Defence Force expects in your drawing and calculation packages.
The scope here covers aboveground and underground diesel tanks, day tanks and fire-pump tanks serving standby generators in industrial premises. We address design and submission requirements under Fire Code 2023 and SS 532:2024 for on-site diesel storage, not import licensing procedures, detailed construction methods or codes outside the SCDF framework. If your facility stores diesel fuel solely to power emergency generators, the technical documentation standards in this guide apply whether you are building from scratch or retrofitting existing capacity.
In direct terms: for storing petroleum safely on site, SCDF expects coordinated architectural, structural and M&E drawings showing tank locations, fuel piping routes, secondary containment, ventilation and fire protection, accompanied by PE-endorsed bund capacity, structural, hydraulic and ventilation calculations – all cross-referenced to one another and to the quantities declared on your GoBusiness application.
Key takeaways from this guide:
-
The minimum drawing sets you must prepare for a P FM storage licence application, from site layouts to bund detail drawings
-
Which engineering calculations SCDF queries most frequently – and how to structure them
-
The roles of the qualified person, Professional Engineer and registered inspector in endorsing your submission
-
Common reasons industrial diesel storage submissions get bounced, and how to prevent them
-
How AEC Technical Advisory supports end-to-end preparation of drawings, calculations and authority submissions for industrial generator diesel systems, including coordination with relevant regulatory bodies
Understanding SCDF P&FM Licensing for Diesel Storage in Industrial Premises
A P FM storage licence is the regulatory approval that permits you to store petroleum products above exemption quantities on your licensed premises. For diesel serving standby generators, this licence is a separate requirement from the fire safety certificate for the building and from the Temporary Occupation Permit. You can hold a valid TOP and FSC and still be operating illegally if your diesel storage exceeds the Class III petroleum storage limit of 1,500 litres without a P&FM storage licence.
Industrial facilities almost always exceed this threshold. A single standby generator rated at 1,000 kVA can consume 200–250 litres per hour at full load; providing 24 hours of autonomy means a bulk tank of at least 5,000 litres. Multiply that by multiple generator sets across a factory or logistics campus, and actual storage volumes of 30–200 m³ are common. Every litre – in bulk storage tanks, day tanks, fire-pump tanks and drum storage – is summed to determine the total storage quantity. A P&FM storage license is required if storage exceeds legal limits, and fines for non-compliance can reach $200,000, with daily fines for ongoing violations reaching $25,000.
Regulatory Framework: Fire Safety Act, Fire Code 2023 and SS 532:2024
The fire safety act establishes the overarching legal authority for regulating petroleum flammable materials in Singapore. Beneath it, the Fire Safety (Petroleum & Flammable Materials) Regulations create the licensing regime, while the fire code provides prescriptive and performance-based rules for building design, compartmentation and fire protection. Technical drawings must align with SCDF Fire Code and SS 532 standards, which also govern storage and protection measures for flammable liquids, including separation distances, bund design, venting specifications, and storage requirements for fixed tanks and portable containers.
SS 532:2024, together with its Corrigendum 1, replaced the earlier 2007 edition and introduced updated separation distance tables, revised bund capacity methodology, new example calculations and refined provisions for vent piping and emergency vents. Industrial projects with designs lodged from December 2024 onwards are expected to comply with SS 532:2024, and QPs must explicitly indicate which edition they designed to on every submitted drawing and calculation sheet.
Diesel as Class III Petroleum and Industrial Thresholds
Diesel is classified as Class III petroleum with a flash point above 60 °C up to 93 °C. For context, Class 0 petroleum includes liquefied petroleum gas (LPG), Class I petroleum has a flash point below 23 °C, and Class II petroleum has a flash point between 23 °C and 60 °C. The Class III petroleum storage limit is 1,500 litres for non-factory premises. A P&FM storage licence is required for diesel over 1,500 litres, and the Class I petroleum storage limit is 400 litres for factory use – relevant when mixed storage scenarios involve solvents alongside diesel.
Total diesel quantity on your licensed premises is calculated by summing all bulk storage tanks, day tanks, fire-pump tanks and any drum storage. A maximum of 700 litres of diesel is allowed in generator rooms according to SCDF Fire Code; anything beyond that must be in a dedicated tank room or external yard. Licensing tiers for diesel storage are based on total storage volume classifications, and fees for P&FM licenses scale with the quantity of materials stored. P&FM licenses are valid for up to three years depending on risk category, after which renewal is required.
Roles of Qualified Person (QP), Professional Engineer (PE) and Registered Inspector (RI)
A qualified person – typically a Professional Engineer or registered architect – is responsible for preparing and submitting fire safety plans and ensuring that all technical documentation meets approved codes. Qualified Persons are required to submit technical and architectural plans for regulatory compliance. Discipline PEs (Structural, Civil, M&E, Fire Protection) provide specialised calculations and endorse specific drawing elements: all engineering calculations must be signed off by a Professional Engineer for compliance.
The registered inspector plays a distinct role at the end of the process, inspecting installed works against approved building plans and fire safety requirements and issuing Form 1 (no deviations) or Form 2 certificates. RI reports must cross-reference drawing numbers and tank capacities exactly – any discrepancy between the RI’s certification and the approved drawings will stall your FM storage licence application.
Understanding this framework sets the stage for knowing what level of drawing detail and engineering substantiation SCDF expects in a licence application.
SCDF P&FM Licence Application Workflow for Standby Generator Diesel Systems
Moving from regulatory overview to practical execution, this section maps the sequence of steps for obtaining a P FM storage licence for generator diesel storage in an industrial project. Think of it as a high-level roadmap; the later sections dive deeper into what goes into the drawings and calculations at each stage.
End-to-End Process: From Concept Design to Licence Issuance
The process begins with conceptual sizing: determining generator capacity (with N+1 redundancy), required autonomy hours, and therefore total diesel volume. This feeds into preliminary fire safety plan submission to SCDF, which requires initial layout drawings and rough bund and ventilation calculations. Once SCDF grants plan approval, detailed design proceeds – full PE-endorsed drawing and calculation packages across architectural, structural and M&E disciplines.
Construction follows, covering tank installation, piping, bunding, structural supports, ventilation systems and fire protection. Upon completion, hydrostatic and leak testing is performed, and the registered inspector conducts a formal inspection against the approved plans. The RI’s certification, together with the fire safety certificate, unlocks the P&FM storage licence application on GoBusiness.
Key process steps where technical drawings and calculations are required:
-
Conceptual diesel storage sizing and preliminary layout
-
Fire safety plan submission to SCDF (architectural layouts, preliminary calculations)
-
Detailed design: PE-endorsed drawings and calculation reports across all disciplines
-
Construction, testing and commissioning (hydrostatic tests, leak tests)
-
RI inspection against approved drawings – Form 1 or Form 2 issued
-
P&FM storage licence application via GoBusiness (upload endorsed plans, calculations, test certificates, emergency response plan)
-
SCDF site inspection and licence issuance
For industrial facilities, the typical timeline from initial fire safety plan submission to licence approval is 3–6 months assuming no major queries. The SCDF typically responds within 19 working days after submission of a complete application. More complex projects involving a quantitative risk assessment or process safety reviews may extend beyond this window.
Digital Submission on GoBusiness and SCDF Touchpoints
P&FM storage license applications are submitted via GoBusiness portal, where you select the licence type (storage of diesel – Class III petroleum), log in via Corppass with your UEN, and upload all endorsed documentation. Applications must include technical documents like architectural drawings.
Core file categories to prepare for upload:
-
Architectural layout plans (site plan, tank room, generator room)
-
Structural detail drawings (foundations, supports, plinths)
-
M&E schematics (fuel piping, venting, instrumentation, fire protection)
-
Bund capacity and venting calculations
-
Structural and hydraulic calculation reports
-
Hydrostatic and leak test certificates
-
Safety data sheets for diesel fuel
-
Emergency Response Plans specific to P&FM risks
-
RI inspection certificates
-
Chemical register entries for all flammable materials stored
Inconsistent tank sizes or labels between drawings and GoBusiness forms is a frequent cause of SCDF queries. Ensure the tank ID, capacity and location used in every document are identical.
New Industrial Builds vs Retrofit or Capacity Upgrades
For greenfield industrial developments, drawings and calculations are developed in coordination with BCA and SCDF design submissions from the outset. All P&FM storage must be indicated in building plans submitted to SCDF, and fire safety works proceed in tandem with construction.
Retrofitting diesel capacity in a live industrial plant carries additional complexity. You may need as-built surveys, mark-up drawings distinguishing existing versus new diesel tanks, phasing plans for temporary fuel lines, and hot-work risk assessments. Any change to previously approved fire safety compartments requires redrawing and recalculation – potentially a new fire safety certificate. The physical conditions match between site reality and approved plans is the first thing SCDF checks, and retrofit projects frequently fail this test.
The remainder of this article focuses on what exactly must go into the technical drawings and calculation packs, regardless of project type.
Technical Drawing Requirements for Diesel Storage Serving Standby Generators
This is the core section: the minimum drawing sets SCDF expects, the drawing scales, annotation standards, and how your storage layouts should visually communicate compliance with fire safety requirements. AEC Technical Advisory typically compiles an integrated drawing package covering architectural, structural and M&E perspectives for industrial projects – ensuring the entire system is presented cohesively to SCDF reviewers.
Key Drawing Types SCDF Expects to See
SCDF requires detailed architectural drawings for P&FM submissions. The essential drawing categories are:
-
Overall site layout plan – showing the full industrial premises, all tank locations relative to buildings, boundaries and access roads, at typically 1:500 or 1:1000 scale
-
Tank room or yard layout – detailed plans at 1:100 or 1:50 showing tanks, bunds, valves, pumps, and fill points
-
Generator room layouts – showing generator sets, day tanks, fuel connections, ventilation and fire protection equipment
-
Fuel piping route drawings – plan and isometric views of supply, return and vent piping
-
Sections and elevations – vertical cuts through tank rooms, bunds and generator spaces showing heights, clearances and vent terminations
-
Detail drawings – enlarged views of bunds, penetration seals, fill points and vent stack terminations
All drawings must show north point, coordinate grid or site reference, drawing numbers and revision status. PE endorsement stamps are required on structural and M&E drawings. Tank tag IDs and capacities used on drawings must match those in calculation sheets and the GoBusiness application form exactly.
Architectural and Layout Plans for Tanks, Bunds and Generator Rooms
Architectural layout plans must detail access doors and ventilation for diesel storage tanks. Their purpose is to demonstrate compliant location, access, compartmentation and escape routes around diesel storage and generator spaces. Site plans for diesel storage must show separation distances from property lines and ignition sources.
Required information on layout plans:
-
Exact location of aboveground and underground tanks relative to buildings, property boundaries and fire engine access routes, with separation distances clearly dimensioned per SS 532:2024 tables
-
Room layouts for indoor tanks and generator rooms: wall fire ratings (minimum 2-hour for fuel tank rooms), door direction of swing, emergency exits, clear escape paths and minimum aisle widths – ensure unobstructed exits and passageways at all times
-
Location of ventilation openings, louvres, exhaust discharge points and make-up air inlets relative to doors, windows and air intakes
-
Spill containment areas: bund walls hatched and labelled, floor gradients towards sumps, and drain arrangements clearly shown
-
Signage locations: NO SMOKING, DIESEL STORAGE, EMERGENCY SHUTOFF placards, and positions of fire extinguishers and emergency stop buttons – fire safety plans must include the locations of fire extinguishers and emergency stop buttons
-
Access routes for emergency vehicles and tanker trucks, including turning radii at filling points
Structural Drawings for Tanks, Foundations and Supports
Structural drawings accompany every diesel tank installation and must be provided as plan, section and detail views for tank foundations, plinths, supporting steel frames and any rooftop supports.
What these structural drawings must show:
-
Foundation type (e.g. reinforced concrete slab, strip footing, pile caps) with thickness, reinforcement layout and concrete strength grade
-
Tank support details: saddles, piers, steel frames, anchor bolts and holding-down arrangements with weld sizes and bolt grades specified
-
Design loads noted directly on drawings: tank self-weight, operating liquid load at full diesel capacity (diesel density approximately 0.85–0.9 kg/L), impact or surcharge loads from tankers or forklifts in industrial yards
-
Deflection and settlement criteria where tanks are supported on suspended slabs or podiums – critical for industrial buildings with production areas or car parks below
-
Fire protection to structural steel supporting tanks where required (intumescent coating specification or fire cladding thickness)
Each structural drawing should reference corresponding calculation sheets (e.g. “Refer Calc S-01 for foundation design loads and checks”) so SCDF reviewers can trace compliance.
M&E Drawings: Fuel Piping, Venting, Instrumentation and Fire Protection
M&E drawings prove safe fuel transfer, leak control and firefighting provisions for the standby generator diesel system. They are often the most scrutinised element of the FM submission process.
M&E drawing requirements include:
-
Fuel piping schematics (single-line diagram) showing suction and return lines, transfer pumps, valves, strainers, non-return valves, and flexible connections at generator and tank interfaces
-
Plan routing of aboveground and underground pipes, including pipe sizes, materials, slopes, supports, and fire-rated penetrations through walls and floors
-
Vent and emergency vent piping routes with terminations above roof level or at safe zones, including flame arrestors and vent stack heights relative to openings – minimum vent pipe slope back to tank of at least 1 in 40 per Clause 9.6 of the Fire Code
-
Instrumentation and controls: level gauges, leak detection probes, high/low level alarms, tank overfill protection, pump auto-stop logic and emergency shutdown buttons
-
Fire protection systems: sprinklers, foam systems, hose reels, extinguishers, fire alarm detectors and manual call points within tank and generator rooms – constituting essential safety equipment for fire prevention
Isometrics and P&ID-style diagrams are strongly recommended for complex industrial fuel systems and should be clearly labelled for SCDF reviewers. SCDF expects tank specifications to include material and corrosion protection details on these drawings.
Detail Drawings for Bunds, Tank Accessories and Penetrations
Certain elements require enlarged detail drawings to demonstrate compliance with SS 532:2024. Bunds around diesel tanks must be designed to prevent spills and leaks, and the engineering details must be unambiguous.
Detail drawing content:
-
Bund cross-section: wall thickness, height, reinforcement, waterproofing coating and diesel-resistant lining specification
-
Floor build-up within bund: screed falls to sump (minimum 1:100 gradient), joint details, and methods to prevent diesel leakage into soil or drains
-
Pipe penetration detail through bund walls and fire walls, including sleeves, sealants and firestop systems with stated fire rating and product approvals
-
Access ladders, handrails and platforms on tanks compliant with workplace safety codes, allowing safe inspection of manholes, gauges and safety equipment
-
Clear call-outs linking each detail back to plan views, so SCDF can cross-reference the secondary containment arrangement against the overall storage layouts
Engineering Calculation Requirements for Diesel Storage and Standby Generators
SCDF expects quantitative proof that the diesel storage and generator support systems are structurally sound, hydraulically adequate, and sized for safe containment and venting. Calculations must be compiled as a structured report, endorsed by relevant PEs, and cross-referenced to drawing numbers. All engineering calculations must be signed off by a Professional Engineer for compliance.
Bund Capacity and Spill Containment Calculations
Bund capacity must hold at least 110% of the largest tank’s volume – this is the fundamental rule under SS 532:2024 for secondary containment. The purpose of the calculation is to demonstrate with explicit volumetric arithmetic that your bund geometry satisfies this requirement.
What the calculation must include:
-
A worked example using actual project dimensions: for instance, two 50 m³ diesel tanks sharing a common bund requires containment of at least 55 m³ (110% of 50 m³), calculated from internal bund dimensions (length × width × effective wall height minus freeboard)
-
Deduction of displaced volume by tank shells, plinths and saddles within the bund footprint
-
Freeboard allowance – typically 150 mm minimum above the calculated liquid level
-
Bund capacity calculations need to account for potential rainfall and firewater in the containment area – if the bund is unroofed, include an allowance for design rainfall intensity
-
Floor slope verification confirming that spilled diesel drains to the sump without overtopping bund walls under a worst-case pool fire scenario
-
Units clearly stated, assumptions documented (e.g. “bund is roofed, no rainfall allowance”), and reference to applicable SS 532:2024 clause numbers
Label bund capacity (in m³) and corresponding tank capacity (in m³) directly on the layout plan for quick SCDF review.
Structural Design Calculations for Tank Foundations and Supports
Structural calculations verify that foundations and supporting structures can safely carry the full weight of diesel tanks plus environmental and operational loads. For industrial sites, particularly those on reclaimed land in Jurong and Tuas, geotechnical conditions add complexity.
Key calculation components:
-
Load determination: tank empty weight, full weight (volume × diesel density of 0.85–0.9 kg/L), wind loads on exposed aboveground vertical tanks, seismic loads if applicable, live loads from maintenance personnel, and impact surcharge from tanker trucks or forklifts
-
Slab or footing design: bending moment, shear and punching shear checks for reinforced concrete elements supporting the tanks
-
Bearing pressure checks against allowable soil bearing capacity, referencing geotechnical investigation data for the specific industrial site
-
Deflection checks for suspended slabs with tanks above production areas or car parks, ensuring serviceability limits are maintained
-
Stability checks for steel support frames: overturning, sliding and buckling verifications, including anchor bolt tension and shear calculations
Sample load tables and bending check summaries should be included in the report to show the level of detail expected.
Hydraulic and Fuel System Sizing Calculations
SCDF may request evidence that fuel transfer systems can safely deliver diesel to generators without cavitation, leaks or over-pressurisation, especially for long pipe runs in large industrial facilities.
Calculation elements to cover:
-
Pipe diameter selection based on required generator fuel flow rate (litres per hour at full load), maximum velocity limits (typically ≤ 1.0 m/s for suction lines) and allowable pressure drop
-
Head loss calculations along transfer lines, accounting for elevation changes between yard tanks and rooftop generators, and friction losses through valves and fittings using Darcy-Weisbach or equivalent methods
-
Pump duty verification: confirm that selected pump head and flow from manufacturers’ curves exceed calculated system resistance with an appropriate safety margin
-
Emergency vent sizing calculations must comply with API 2000 guidelines – analysis showing vent lines are sized to prevent overpressure or vacuum during filling and emptying operations
|
Pipe Size (DN) |
Flow Rate (L/hr) |
Velocity (m/s) |
Pressure Drop (kPa/100m) |
Suitability |
|---|---|---|---|---|
|
DN25 |
500 |
0.28 |
1.2 |
Day tank feed |
|
DN40 |
1,500 |
0.33 |
0.9 |
Single generator |
|
DN50 |
3,000 |
0.42 |
1.1 |
Multiple generators |
|
DN80 |
8,000 |
0.44 |
0.8 |
Bulk transfer |
Ventilation, Heat Release and Fire Protection Calculations
For enclosed tank rooms and generator rooms, SCDF commonly requests calculations for ventilation rates and, in some cases, heat release and fire load to verify adequacy of proposed fire protection and smoke control systems.
Calculation guidance:
-
Minimum air change calculations using Fire Code or SS guidance, based on room volume and required ACH for diesel storage spaces (typically 6–12 air changes per hour depending on classification)
-
Smoke extraction sizing where applicable: compute design airflow for removing combustion products from generator rooms during a fire event
-
Basic fire load calculations estimating combustible energy from diesel volume and ancillary materials, to justify sprinkler density or hose reel provision
-
A quantitative risk assessment is required for large diesel quantities – outputs such as pool fire radiation distances directly influence the separation distances shown on your drawings and may require review by the major hazards department
Consistency Checks and Summary Tables
Cross-checking is where many industrial submissions fail. SCDF queries often arise when quantities and dimensions do not match between drawings, calculation reports and GoBusiness forms. Maintain a detailed chemical register for stored materials and reconcile it against design documents.
Best-practice summary table template:
|
Tank ID |
Capacity (m³) |
Drawing Ref |
Bund ID |
Bund Volume (m³) |
Calc Sheet Ref |
GoBusiness Qty |
|---|---|---|---|---|---|---|
|
DT-01 |
50 |
A-101, S-201 |
B-01 |
58.5 |
C-BND-01 |
50,000 L |
|
DT-02 |
50 |
A-101, S-202 |
B-01 |
(shared) |
C-BND-01 |
50,000 L |
|
DT-03 (Day) |
0.7 |
M-301 |
– |
In gen. room |
C-HYD-01 |
700 L |
This table should be a living document from early design through to licence submission, ensuring the quantity stored in every document is consistent.
Documentation, Testing and Review Before SCDF Inspection
Beyond drawings and calculations, a P FM storage licence application requires supporting reports, certificates and test records that together form the key documents for SCDF’s desk review and subsequent site inspection.
Supporting Reports, Certificates and Test Records
Documents typically required:
-
Hydrostatic and leak test reports for tanks and fuel piping, with test pressures, durations and dates close to commissioning
-
Material and factory test certificates for tanks (compliance with SS 532, relevant EN or UL standards) and critical valves and pumps
-
PE-certified structural inspection reports for tank foundations and supports
-
A comprehensive emergency response plan specifically addressing diesel spills, generator fires and tank incidents at industrial premises – Emergency Response Plans are required for P&FM license applications, and should include provisions for the company emergency response team, evacuation fire drills and emergency response equipment
-
Safety data sheets for diesel and any other flammable materials on site
-
Chemical register entries demonstrating that declared quantities match design capacity
SCDF requires comprehensive documentation including Safety Data Sheets for hazardous materials. AEC Technical Advisory can help industrial clients compile these into a coherent, indexed submission pack to minimise queries.
SCDF Technical Review and Site Inspection Focus Areas
SCDF’s desk review examines drawings, calculations, certificates and declared quantities for internal consistency and code compliance. SCDF typically processes applications within 19 working days – but only if the submission is complete and consistent. Submit evidence of rectification for any non-conformities found during the review.
Frequent on-site focus points during SCDF site inspection:
-
Whether tank and piping installation matches approved drawings – location, capacity, vent terminations, bund configuration must reflect the approved plans
-
Presence and condition of bunds, sumps, isolation valves, overfill protection and leak detection systems
-
Clear and unobstructed access routes for fire-fighting and emergency vehicles, with proper signage and lighting
-
Operational tests of emergency shutdown, alarms and fire protection equipment in generator rooms
-
Verification that stored quantities do not exceed the licensed capacity and that the physical conditions match what was declared
Conduct regular inspections to verify compliance with safety standards and maintain site safety protocols even after licence issuance. License validity lasts up to three years, requiring renewal with updated documentation.
Digital Organisation and Version Control of Technical Files
Robust file management prevents many submission and site inspection failures. SCDF increasingly rejects applications where drawing revisions, stamps or references are inconsistent.
File management best practices:
-
Separate folders for architectural, structural, M&E drawings, calculation reports, test certificates and ERPs
-
Ensure drawing revision numbers referenced in RI reports and GoBusiness forms match the uploaded PDFs exactly
-
Avoid scanned copies with illegible stamps or signatures; use high-resolution PDF exports from CAD software
-
Maintain consistent project naming conventions linking drawings and calculations (e.g. “PRJ-DT-A101-Rev03” maps to calculation “PRJ-DT-CBND01-Rev03”)
Common Industrial Pitfalls in Drawings and Calculations – and How to Avoid Them
Many industrial P&FM licence delays stem from avoidable drawing or calculation issues rather than fundamental design problems. AEC Technical Advisory has observed recurring patterns across factories, logistics hubs and industrial plants that consistently trigger SCDF queries.
Mismatch Between Declared Diesel Quantities and Drawings
One of the most common reasons submissions get bounced is inconsistency between tank sizes on drawings, capacities stated in calculation reports, and quantities declared in GoBusiness forms.
How to avoid this:
-
Implement a single master “Diesel Inventory Table” early in design and keep it updated through all revisions
-
Ensure all disciplines (Architectural, C&S, M&E) and the client sign off on maximum intended storage capacity before submission
-
Cross-check tank nameplates during commissioning against design assumptions and update documents if procurement changed capacities
-
Remember that all P&FM storage must be indicated in building plans submitted to SCDF – omitting a day tank or drum store invalidates the submission
Insufficient Detail in Bund and Vent Drawings
SCDF frequently raises queries when bund dimensions, materials, slopes and vent termination points are not clearly shown or calculated. Secondary containment must hold at least 110% of the largest tank’s capacity, but simply stating this without showing the arithmetic is insufficient.
Preventive measures:
-
Always provide at least one enlarged bund detail per bund, with explicit internal dimensions that directly correspond to the numbers used in volume calculations
-
Show vent pipes in both plan and elevation with heights and distances to openings fully dimensioned
-
Label bund capacity (in m³) and corresponding tank capacity (in m³) directly on the layout plan
-
For chemical storage facilities with mixed storage limits involving other flammable materials alongside diesel, show segregation clearly
Overlooking Industrial Site Constraints: Access, Traffic and Adjacent Uses
Inadequate consideration of tanker access routes, truck traffic and nearby hazardous processes can compromise SCDF acceptance, particularly in dense industrial estates.
What to address on drawings:
-
Show dedicated tanker turning radii and filling points on site plans for truck-served industrial premises
-
Demonstrate separation from high-occupancy areas (canteens, offices) and from other hazardous storage (scheduled chemicals, LPG, Class II petroleum solvents) through dimensioned drawings
-
Consider upstream and downstream process units when placing tanks in refineries or petrochemical-style industrial facilities – potential hazards from adjacent operations affect separation distance requirements
-
Address proximity to national environment agency regulated areas or drains, ensuring bund drainage does not discharge to open waterways
Inadequate Coordination Between Structural and M&E Designs
Diesel pipe penetrations, supports and openings are often added late in the design process, conflicting with structural elements in industrial plants. This is a problem that pre-submission design checks can catch early.
Solutions:
-
Hold regular interdisciplinary coordination meetings focusing specifically on tank foundations, pipe supports and penetrations
-
Use 3D models or coordination drawings for complex plants where fuel lines cross cable racks, ducts and process pipe racks
-
Agree on pipe sleeve sizes and locations early, coordinated between structural and M&E drawings, to avoid on-site coring that invalidates approved plans and triggers resubmission
Conclusion and Practical Next Steps for Industrial Owners
Successful SCDF P&FM licensing for standby generator diesel storage in industrial premises hinges on complete, consistent technical drawings and robust, well-documented calculations. The strict legal mandate under Singapore’s fire safety regulations means there is no shortcut – every drawing must be coordinated, every calculation must be PE-endorsed, and every number must match across the entire system of documents.
Key elements to get right:
-
Know your cumulative diesel quantities and regulatory obligations early – sum all bulk tanks, day tanks, fire-pump tanks and drums on the licensed premises
-
Prepare coordinated architectural, structural and M&E drawings with adequate detail on tanks, bunds, vents and generator rooms
-
Compile structural, hydraulic and bund capacity calculations that are clearly referenced, unitised and PE-endorsed
-
Conduct internal reviews and pre-inspection checks before engaging SCDF for site inspection, using a PE pre-inspection checklist
Actionable checklist for industrial facility owners:
-
Confirm total diesel volume across all storage points on site
-
Appoint QP and discipline PEs for architectural, structural, M&E and fire protection scopes
-
Prepare drawing list aligned with SCDF expectations (site plan, tank/generator layouts, piping, bund details, sections)
-
Assemble calculation pack: bund capacity, structural loads, hydraulic sizing, ventilation and fire load
-
Verify all drawings and calculations against SS 532:2024 and Fire Code 2023
-
Compile test certificates, SDS, ERP and chemical register
-
Upload complete package via GoBusiness with consistent tank IDs and capacities
-
Prepare site for SCDF inspection – verify physical conditions match approved plans
AEC Technical Advisory serves as a one-stop consultant for industrial clients needing integrated architecture, engineering design and SCDF authority submissions for diesel storage and standby generator systems – from concept sizing through to licence issuance.
Additional Resources and Visual Aids
Useful reference materials for industrial practitioners:
-
SCDF’s official P&FM storage licence application guide – lists all required documentation and templates
-
SS 532:2024 scope summary – for separation distance tables and bund calculation methodology
-
AEC Technical Advisory’s P&FM quantity limits and containment guide – practical guidance on exemption quantities and mixed storage scenarios
-
Fire compartmentation for chemical storage facilities – relevant where diesel is stored alongside other flammable materials or scheduled chemicals
FAQ: Technical Drawings and Calculations for SCDF P&FM Diesel Storage Licences
These frequently asked questions address specific issues industrial owners and contractors commonly raise about documentation for diesel storage serving standby generators.
What is the minimum set of drawings SCDF expects for a diesel storage P&FM licence?
SCDF expects the following as a minimum:
-
Overall site layout plan showing all tank locations and separation distances
-
Tank room or yard layout plans with bund details and access routes
-
Generator room layouts showing day tanks, fuel connections and fire protection
-
Fuel piping schematics (single-line diagrams and route plans)
-
Sections and elevations through tank rooms and bunds
-
Enlarged detail drawings for bunds, penetrations and vent terminations
All drawings require QP and relevant PE endorsement. Drawing numbers must be referenced consistently in calculation reports and GoBusiness application forms.
Do I need full structural calculations if my diesel tank is on a ground slab in an industrial yard?
Even ground-level installations require structural verification. For small tanks on thick existing ground slabs with good bearing capacity, simplified checks – confirming that bearing pressure under the full tank is within allowable limits – may suffice. However, for large aboveground tanks (30 m³ and above), poor ground conditions typical of reclaimed industrial land, or tanks on suspended slabs, detailed foundation design including bending, shear, punching shear and deflection checks is required. SCDF expects PE-endorsed structural calculations proportionate to the risk.
How detailed must bund capacity calculations be for SCDF approval?
SCDF expects explicit volume calculations using internal bund dimensions (length × width × effective height), deduction of volume displaced by tank shells and plinths, freeboard allowance, and – for unroofed bunds – rainfall considerations. A generic statement that “bund complies with 110% rule” is not acceptable. The calculation must show the arithmetic, state units and assumptions, reference the applicable SS 532:2024 clause, and link to the specific tank IDs and capacities shown on drawings.
Can I reuse existing generator and tank drawings for a licence renewal?
Only if the installation has not changed, the drawings accurately reflect the as-built condition, the applicable standards have not materially shifted, and all documents remain legible with valid PE endorsements. Since SS 532:2024 replaced the 2007 edition, drawings designed to the older standard may need updating for renewal applications. If any modifications have been made to tanks, piping, bunds or generator rooms, updated as-built drawings and recalculations are required.
How can AEC Technical Advisory support my industrial facility with SCDF P&FM submissions?
AEC Technical Advisory provides end-to-end support for industrial diesel storage P&FM licence applications: diesel system concept design and sizing, preparation of all required architectural, structural and M&E drawings, compilation of PE-endorsed calculation reports (bund capacity, structural, hydraulic, ventilation), coordination with QPs and RIs, GoBusiness submission support, and pre-inspection audits tailored to industrial plants and warehouses. The firm’s integrated approach across architecture and engineering disciplines eliminates the coordination gaps that cause most SCDF rejections.